Modify message

The message has the following error or errors that must be corrected before continuing:
Warning: this topic has not been posted in for at least 180 days.
Unless you're sure you want to reply, please consider starting a new topic.
Attachments: (Clear attachments)
Restrictions: 6 per post (6 remaining), maximum total size 64.00 MB, maximum individual size 29.30 MB
Uncheck the attachments you no longer want attached
Click or drag files here to attach them.
Other options
Shortcuts: ALT+S post or ALT+P preview

Topic summary

Posted by CDNRatMan
 - October 26, 2015, 18:55:08 PM

   Name is CDNRatMan not PC so figure it should take me about 3 weeks of getting it done........take my time and relax...lol...

Posted by Pilgrim
 - October 26, 2015, 17:09:26 PM

You should be able to get all that done in 9 months...thanks in advance for the videos.

Posted by CDNRatMan
 - October 18, 2015, 19:03:00 PM

  Ok due to medical issues with my leg and the temps down to the low 30's now, I am parking my bike and going to start my 2015 project list. Here is my list of proposed projects for the bike this winter.

1. Oil / filter change,
2. New tires front and rear, adding counter balance beads
3. New wheel bearings front and rear, All Ball Bearing kits,
4. New steering head bearings again All Ball Bearings,
5. Zerk fitting in the neck as per Troll and GB,
6. Swing arm bearings replaced,
7. Drilled rotor for the front from a Classic 800,
8. New Stainless Steel Brake lines in black of course, and a +2" extension on the front one,
9. Check and clean calipers as I have this all apart,
10. Switching the power point to a USB type,
11. Weld some tabs on the Front engine guard for new LED lights and my highway pegs,
12. Then take a bunch of parts for powder coating.

Pretty simple list and I have all the parts in the spare room right now so as soon as the bike is inside I will commence and start with the rear wheel and work forward. I will be making a record and taking pictures if anyone needs any help with these projets, and of course my tech support team is only an e mail away right Troll and GreenBarn. then my moral support he is also only a e mail call away ....49....49 were are you...... :o

SMF spam blocked by CleanTalk