We limit access by GUESTS to protect our members from spam, hacks and trolls. Please register to gain access to all our resources.
You should be able to get all that done in 9 months...thanks in advance for the videos.
Ok due to medical issues with my leg and the temps down to the low 30's now, I am parking my bike and going to start my 2015 project list. Here is my list of proposed projects for the bike this winter.
1. Oil / filter change,
2. New tires front and rear, adding counter balance beads
3. New wheel bearings front and rear, All Ball Bearing kits,
4. New steering head bearings again All Ball Bearings,
5. Zerk fitting in the neck as per Troll and GB,
6. Swing arm bearings replaced,
7. Drilled rotor for the front from a Classic 800,
8. New Stainless Steel Brake lines in black of course, and a +2" extension on the front one,
9. Check and clean calipers as I have this all apart,
10. Switching the power point to a USB type,
11. Weld some tabs on the Front engine guard for new LED lights and my highway pegs,
12. Then take a bunch of parts for powder coating.
Pretty simple list and I have all the parts in the spare room right now so as soon as the bike is inside I will commence and start with the rear wheel and work forward. I will be making a record and taking pictures if anyone needs any help with these projets, and of course my tech support team is only an e mail away right Troll and GreenBarn. then my moral support he is also only a e mail call away ....49....49 were are you...... 
Page created in 0.081 seconds with 13 queries.