Modify message

The message has the following error or errors that must be corrected before continuing:
Warning: this topic has not been posted in for at least 180 days.
Unless you're sure you want to reply, please consider starting a new topic.
Attachments: (Clear attachments)
Restrictions: 6 per post (6 remaining), maximum total size 64.00 MB, maximum individual size 29.30 MB
Uncheck the attachments you no longer want attached
Click or drag files here to attach them.
Other options
Shortcuts: ALT+S post or ALT+P preview

Topic summary

Posted by CDNRatMan
 - September 22, 2014, 20:50:39 PM

  And I have been guilty of just that issue and that is also part of taking pictures as I progress because it prevents that. Also why some projects are put off till winter time because then I can take my time and look it over think it through and then execute the idea and do it correctly and properly.
And I have a fail safe back up also. YOU to check up on me......lol.......

Posted by Troll
 - September 22, 2014, 19:30:24 PM

Just checking...sometimes people are in a hurry and skip steps...

Posted by CDNRatMan
 - September 22, 2014, 12:34:52 PM

 >:(   Troll please I am slow but not stupid....lol....yes I did all that and even cleaned the old grease off the pivot points.....and in about 35 days I'll be thinking of moving the bike indoors as after Halloween it will snow.

thanks D1 and PC

Posted by pcarrell
 - September 22, 2014, 12:23:31 PM

For such a small change, that's a huge improvement!

Posted by Drift1
 - September 22, 2014, 12:14:09 PM

Looks good Ratman .

Posted by Troll
 - September 22, 2014, 10:54:25 AM

You put white lithium grease on all the contact and moving points, didn't you? Did you lube your clutch cable while it was apart?

Posted by CDNRatMan
 - September 22, 2014, 10:48:01 AM

    ok between cutting and stacking wood from the storm, I did one of my winter projects because the powder coater got them done early.....

SMF spam blocked by CleanTalk